Operating throughout the UK on projects for healthcare, education, commercial, residential, retail, leisure and other public sector clients, Metcon can demonstrate a commitment to delivering a quality product and outstanding service every time.
Main Contractor: John Sisk
Engineer: Capita Bobrowski Ltd
Project Solution: 160 - 200mm concrete slab, Kingspan Multideck, A252 mesh, highly reinforced, easyfloat and powerfloat finishes
Concrete Area: 11,500 m²
Metcon was contracted to complete works on Hilton's flagship hotel at Terminal 5, London Heathrow Airport. The ...
Main Contractor: Morgan Ashurst
Engineer: BDP
Project Solution: 150mm concrete slab on SMD TR60 deck, A193 mesh, powerfloat finish
Concrete Area: 3,838 m²
Metcon was contracted to supply and install a traditional mesh reinforced 150mm concrete slab as part of the construction of ‘The Point', a new £10.1m hosp...
Main Contractor: The Buckingham Group
Project Solution: 150mm concrete slab incorporating A193 mesh reinforcement, additional layres of Kingspan MD60 V2, powerfloat finish.
Concrete Area: 17,000 m²
Metcon secured the contract to supply and install 17,000m2 of concrete flooring across a striking four storey, 375m long new stadium and hospitality complex at the prestigious Silverstone race track.
Contr...